The experience of FCC Construcción in the USA is reflected in the construction of the Gerald Desmond bridge. These works will replace the existing bridge under which 15% of all the maritime traffic in the USA passes.
The new bridge connects the heart of the Terminal Island port complex with the port of Long Beach and provides a transit area to downtown and other nearby Californian towns.
It is the first cable-stayed bridge built in the state of California.