Protection of the social and environmental surroundings in the Ribeiradio and Ermida dams
Description of social and environmental performance
Problem detected:
The works are located in a natural area, classified as RAN, spanning 409,000 m2 and in a natural area, classified as REN, of 3,256,400 m2. Its execution affects a surface area of 661,000 m2 of Public Water Supply and 20,000 m in length of water lines.
Both the Ribeiradio Dam and Ermida Dam as well as access to them are works of great impact in the community; therefore, a series of measures were implemented in their execution in order to minimise and regularly monitor the impact.
Solutions Adopted:
Some of the measures implemented throughout the project are:
- Monitoring Program the ecological quality of water, periodically conducting physicochemical, hydromorphological and biological characterisations.
- Terrestrial wild animals monitoring program (mammals, reptiles and amphibians) and ichthyofauna (flat water, freshwater species, migratory anadromous, European eel, ecological flow adequacy, etc.)
- Socioeconomic monitoring program, conducting a monitoring of expropriations, air quality and noise impact.
- Study and graphic recording of the elements of the archaeological heritage.
- Wastewater treatment system.
- Transplantation of plant species.
- Proper management of hazardous waste.
- Reuse of 38% of excavated soil and 87% of the topsoil.
Results:
The results were ideal
Almacenamiento de combustibles
Almacenamiento de sustancias y residuos peligrosos
Estudio y registro gráfico
Estudio y registro gráfico
Estudio y registro gráfico
Medición del flujo del rio
Medición del flujo del rio
Medición del flujo del rio
seguimiento de la ictiofauna
seguimiento de la ictiofauna
seguimiento de la ictiofauna
Sistema de tratamiento de aguas residuales
Sistema de tratamiento de aguas residuales
Sistema de tratamiento de aguas residuales
Transplante de especies vegeales
Transplante de especies vegeales
vista aerea
vista aerea